Example Basement Project 1
This house is located in Aurora. It has 1000 square feet unfinished basement with no prebuild plumbing system (no rough in) . |
First week Progress:
In the first week, the framing was completed in the first two days. Then the plumbing system for the sink, shower and toilet is completed. Electrical wires were layed out inside conduit pipes. Drywall is completed 70%. |
 |
 |
| Framing is completed in the first two days. |
Framing is completed in the first two days. |
| |
|
 |
 |
| A layer of masanary water proof is painted on the wall according to owner request. Electrical boxed are installed at framing time. |
Electrical boxed are installed at framing time. |
| |
|
 |
 |
| Building the frame |
Working on electricals. |
| |
|
| |
|
 |
 |
| Framing |
Framing |
| |
|
 |
 |
| Plumbing system for the Sink and Shower. |
Plumbing system for the toilet. |
| |
|
 |
 |
| Electrical system. |
Insulation on outside facing walls, cable outlet. |
| |
|
 |
 |
| Install drywall. |
Drywall installed. |
| |
|
 |
 |
| Staircase is enclosed to be a storage space. |
Double electrical switches installed. |
| |
|
Second week Progress:
In the second week, Drywall installation, patching, sanding is completed and painting is also completed. |
 |
 |
| The walls are painted golden yellow. |
The walls are painted golden yellow. |
| |
|
 |
 |
A small decorating structure is created to enclose and hide a piece of exposing pvc pipe.
You can put some decorating art work on it. |
Basement Stair Hallway is finished and painted. |
 |
 |
| Basement Stair Hallway is finished and painted. |
Original exposed metal beam and pillar are enclosed now. |
Third week Progress:
In the third week, painting, trimming, floor tile, bathroom, door, dropdown ceiling etc. are all done. Basement is finished 95%. |
 |
 |
| Ground tile installed, Ceiling completed with recess lightling. Door installed, trim completed. |
Ground tile installed, Ceiling completed with recess lightling. Door installed, trim completed. |
| |
|
 |
 |
| Large Closet, with trim, tile floor, ceiling and light. |
Large Closet, with trim, tile floor, ceiling and light. |
 |
 |
| Bathroom completed. Vanity, light, mirror. |
Bathroom completed. Shower. |
 |
|
| Toilet installed. |
|