Example Basement Project 1

This house is located in Aurora. It has 1000 square feet unfinished basement with no prebuild plumbing system (no rough in) .

 

First week Progress:

In the first week, the framing was completed in the first two days. Then the plumbing system for the sink, shower and toilet is completed. Electrical wires were layed out inside conduit pipes. Drywall is completed 70%.

Framing Framing
Framing is completed in the first two days. Framing is completed in the first two days.
   
New Hardwood Floor New Hardwood Floor
A layer of masanary water proof is painted on the wall according to owner request. Electrical boxed are installed at framing time. Electrical boxed are installed at framing time.
   
Installer at work Installation team
Building the frame Working on electricals.
   
   
Plywood Install Plywood
Framing Framing
   
Installer at work Finished Hardwood Floor
Plumbing system for the Sink and Shower. Plumbing system for the toilet.
   
Electrical Insulation installed
Electrical system. Insulation on outside facing walls, cable outlet.
   
Install Drywall Drywall Installed
Install drywall. Drywall installed.
   
Staircase Enclosed Switch installed
Staircase is enclosed to be a storage space. Double electrical switches installed.
   

Second week Progress:

In the second week, Drywall installation, patching, sanding is completed and painting is also completed.

Painted Basement Painted Basement
The walls are painted golden yellow. The walls are painted golden yellow.
   
Painted Basement Painted Hallway

A small decorating structure is created to enclose and hide a piece of exposing pvc pipe.

You can put some decorating art work on it.

Basement Stair Hallway is finished and painted.
Painted Hallway Painted Basement
Basement Stair Hallway is finished and painted. Original exposed metal beam and pillar are enclosed now.

Third week Progress:

In the third week, painting, trimming, floor tile, bathroom, door, dropdown ceiling etc. are all done. Basement is finished 95%.

a a
Ground tile installed, Ceiling completed with recess lightling. Door installed, trim completed. Ground tile installed, Ceiling completed with recess lightling. Door installed, trim completed.
   
a a
Large Closet, with trim, tile floor, ceiling and light. Large Closet, with trim, tile floor, ceiling and light.
a a
Bathroom completed. Vanity, light, mirror. Bathroom completed. Shower.
a  
Toilet installed.  
   


华人周六舞会


Join Dance Party Email List
Email:  


Dance

舞会照片


交谊舞自学录像


Address:

Xilin Asian Community Center, 1163 E. Ogden Avenue Suite 301, Naperville, IL 60563

Date:
Biweekly. Every other Saturday Night
8:00 PM - 12:00 PM

Next 2 Party:

2/14/09, 2/28/09

 

 

 

This website is created and maintained by Henry Yu.