Example Basement Project 4

This house is located in Westmont. It has 700 square feet unfinished basement with no prebuild plumbing system (no rough in) . Tile was installed as basement floor cover.

We also installed 700 square feet hardwood floor on the first floor, and 13 hardwood stairs and railing leading to the basement.

The total project was completed in 4 weeks.

 

Framing Framing
Framing is completed in the first two days. You can still see the original concrete wall and concrete ground. Framing is completed in the first two days. You can still see the original concrete wall and concrete ground.
   
New Hardwood Floor New Hardwood Floor

Metalic Counduit are used for all electrical wiring.

Here conduit and wires are extended from the main basement circuit breaker to the junction box for outlet and wall switches.

Metalic Counduit are used for all electrical wiring.

Here conduit and wires are extended from the main basement circuit breaker to the junction box for outlet and wall switches.

   
Installer at work Installation team
Concrete floor is cut, dirt is digged out to bury the waste water routing pipes for the bathroom toilet and shower. Waste water is routed to the waste water well. Horizontal view. Concrete floor is cut, dirt is digged out to bury the waste water routing pipes for the bathroom toilet and shower. Waste water is routed to the waste water well. Vertical view.
   
Plywood Install Plywood
Here you can see the framed bathroom and the utility room, the broken concrete floor, and the waste water well in the utility room.

Waste water routing pipes has been buried, and the concrete floor was repaired with fresh concrete. The toilet flange was installed. Cold water copper pipe is installed.

   
Installer at work Finished Hardwood Floor
Drywall is installed, cold, hot water and waste water pipe is installed for the sink. Patching drywall.
   
Electrical Insulation installed
Basement Bathroom complete. Toilet installed. Basement Bathroom complete, Shower is created with slate tile on the wall.
   
Install Drywall Drywall Installed
Basement Bathroom complete, sink installed. GFCI outlet is installed on the wall, as required by the National Electrical Code. Showing bathroom mirror, vanity light and GFCI outlet.
   
Staircase Enclosed Switch installed
Finished basement, tile on ground, electrical outlet along the wall. Finished basement, with drop dwon ceiling and recessed light.
   
Painted Basement Painted Basement
Hardwood stair and stair railing is installed. Side view. Closer view.
   
Painted Basement Painted Hallway

Hardwood stair and railing, top down view.

Hardwood stair and railing, top down view.
   
   


华人周六舞会


Join Dance Party Email List
Email:  


Dance

舞会照片


交谊舞自学录像


Address:

Xilin Asian Community Center, 1163 E. Ogden Avenue Suite 301, Naperville, IL 60563

Date:
Biweekly. Every other Saturday Night
8:00 PM - 12:00 PM

Next 2 Party:

2/14/09, 2/28/09

 

 

 

This website is created and maintained by Henry Yu.